A Website for Construction Companies That Actually Run the Job

The homeowner planning a kitchen started saving photos in January, found three builders online in March, and called one in June — this is the site that gets you into that comparison.

  • Built for you — you never open a page builder
  • $25/month covers the domain, hosting and support
  • 30 days free on a yoursite.buildernow.net address
Build Your Construction Website

We build awesome
Construction websites.

Fill out your information and in 3 simple steps your preview will be built, no coding necessary.

Pick a Domain

The beginning of your home on the web starts with a name.

Describe Your Business

Tell us a bit about your business; the services you offer, and your history.

Tell Us About You

Let us know how customers can best contact or reach you.

Unlimited Possibilities.
3 simple steps.

Watch this short video for a quick walk through on how simple it is to get your website online.

Get Your Business Online Within in Minutes

Website Design made easy. Just one click away.

Get Started

Why Construction businesses choose BuilderNow

Fast, Friendly, Secure, Quality

Fully Secured

All of our websites are fully secured with SSL encryption as well as top of the line servers.

Best Performance

Our web hosting servers have an uptime of 99.99%. Host with us hassle free with an online gurantee.

What a weak website costs a Construction business

The six-month kitchen happens without you

A homeowner starts a folder of cabinet photos in winter and calls contractors in spring. For those months she is quietly building a short list from what she can find online. If there is nothing of yours to find, you were never on that list — you only hear about the job if a friend says your name out loud.

Referrals get checked before they get called

Your name gets passed along at a kid's game, and the first thing that happens is a search. A stale Facebook page and a photo of a truck does not tell anyone whether you frame additions or hang doors. A referral who cannot confirm what you do goes cold, and you never find out it existed.

You read online like a guy with a magnet sign

A licensed GC carrying general liability, workers' comp and a vetted sub list looks exactly like an uninsured handyman with a cell number. Scope, insurance, how you sequence a job and how you handle money are all invisible until someone calls you, and most people would rather not call to find out.

Nobody can tell which of your three businesses to hire

Kitchen and bath remodels, whole-house additions and light commercial tenant improvement are three different buyers reading for three different things. Show only a strip-mall buildout and a homeowner assumes you are too big for her primary bath. Show only bathrooms and a property manager assumes you cannot turn a suite.

How customers choose a Construction company

Construction has the longest research phase in the trades. A second-story addition starts as a Pinterest board and a late-night article about what it costs per square foot, and that goes on for months before anyone picks up a phone. By the time your phone rings, the caller has read cost ranges, looked at a dozen builders, and formed an opinion about who seems organized. Pricing is the first thing they hunt for and almost never the thing they find, which is why the builder who publishes a real range or even an honest explanation of what drives cost gets remembered.

What they check next is narrow. They want recent reviews, not a four-year-old average, and they read the three-star ones carefully because that is where a job that went sideways gets described. They want proof you have done their specific job — a galley kitchen opened into a dining room, a 400-square-foot bedroom addition on a crawlspace, a dental suite built out to code. And they want to understand how money moves: what a draw schedule looks like, what an allowance covers, what happens when they change their mind in week six.

Demand moves in two different rhythms. Exterior work, additions and custom builds load into spring and summer, so the calls that decide your summer come in February and March. Interior remodels fill the back half of the year, and January is when people finally commit to the kitchen they talked about all holiday. Light commercial runs on lease dates instead of weather — a property manager with a tenant moving in on the first has a hard deadline and will hire the builder who looks reachable today. Across all of it, homeowners usually talk to only a couple of contractors, so being missing from the first search is often the whole loss.

What a Construction website needs

Three clear paths off the home page

Remodel, addition or custom build, and light commercial tenant improvement each get their own page, their own projects and their own language, so the right buyer lands somewhere that sounds like their job.

Project pages with the scope written out

A photo grid proves you own a camera. A page that says what wall came out, what beam went in, how long the family lived in the house and what the punch list looked like proves you ran the job.

A page on how you actually run a job

Your real product is coordination — the electrician before the drywaller, the rough-in inspection before insulation, cabinets ordered before the floor goes down. Spelling out that sequence is the most convincing page on the site.

Allowances explained before the first meeting

A tile allowance and a client who falls in love with a slab three times the number is the oldest fight in remodeling. Explaining allowances in plain language on the site means the conversation happens early instead of at the tile shop.

Cost-plus and fixed price, side by side

Most homeowners have never heard either term. Laying out what each one means for their budget and their risk puts them at the table ready to choose instead of suspicious of whichever one you name.

Your draw schedule and change order policy in writing

Draws tied to milestones, lien waivers collected from subs before each one, and every change priced and signed before work continues. Published rules make you look like a builder with a system, not a guy with a truck.

Selections and lead times, honestly

Cabinets and windows drive the calendar more than labor does. A page that says when selections are due and what a twelve-week cabinet order does to a schedule sets expectations you will be glad you set.

A contact path that works with dirty hands

Tap-to-call at the top, hours, the areas you build in, and a short form that asks the one useful question: what are you trying to build? No ten-field questionnaire nobody finishes on a phone.

Construction services your site should cover

Kitchen remodels

New cabinets, counters, lighting and layout, including opening a wall into the dining room. We walk selections with you early so the order dates hold the schedule together.

Bathroom remodels

Primary baths, hall baths and powder rooms taken down to studs and rebuilt waterproofed. We keep one bathroom live whenever the house only has two.

Whole-house additions

Bedrooms, family rooms and primary suites added onto the existing structure, foundation through roof tie-in. Framing it to look original from the street is the part that takes real care.

Second-story additions

Adding a floor instead of a footprint when the lot is tight. Expect structural review of what is already holding the house up, and expect to be out of the house for part of it.

Custom home building

A new house from a plan on your own lot, coordinated from site work and footings to the final walkthrough. One builder carrying the schedule, the subs and the inspections.

Garage conversions and ADUs

Turning a garage or a backyard slab into a legal living space with its own kitchen and bath. Good for rental income, aging parents and an adult kid who came home.

Basement finishing

Framing, insulation, mechanical reroutes and egress to turn unfinished square footage into real rooms. Usually the cheapest space you will ever add per square foot.

Whole-house renovation

A tired house taken back to studs and rebuilt — wiring, plumbing, HVAC, windows, finishes. The right move when fixing one room at a time stopped making sense.

Structural work

Load-bearing walls removed, beams and posts set, sagging floors leveled. Engineered and inspected, because this is the one category nobody should price shop.

Light commercial tenant improvement

Suite buildouts and reconfigurations for offices, clinics, salons and small retail. Built around your lease date, with the inspections sequenced so the tenant can open on time.

Design-build and preconstruction

Drawings, a real budget and a schedule before anyone demolishes anything. It costs a little up front and it is how a project avoids the surprise that doubles it later.

BuilderNow compared with doing it yourself

BuilderNow DIY website builders
Who builds the site We do, from your job photos, scope notes and trade list You do, at night, after a twelve-hour day on a job
Price $25/month or $250/year with the domain, hosting and support included A plan fee, then the domain and add-ons billed on top
Reading it on a phone Built phone-first, because that is where homeowners read it The mobile layout is yours to check and fix
Making a change Email us the new project or the new number; we handle it Log in and edit it yourself, every time
Knowing the trade We already know what an allowance, a draw and a punch list are A generic contractor template you fill in word by word
Trying it 30 days free on yoursite.buildernow.net, custom domain on the paid plan Free tiers usually keep their branding on your address

Why this matters for Construction businesses

69% of homeowners search for pricing online before contacting a contractor.

Mantel, 2025

Homeowners contact an average of 2.1 contractors before hiring.

Mantel, 2025

52.5% of homeowners use online reviews to judge a contractor's quality before making contact.

Mantel, 2025

66% of consumers say they would be more likely to hire a contractor or home services provider that has a website.

DreamHost, 2026

Construction website questions

Put the rule where clients read it before they sign: every change gets written up, priced and signed before the work goes in. Verbal change orders wreck the schedule and the relationship at the same time, because the invoice shows up as a surprise and a good client turns into a bad review. Clients who read the policy early send an email instead of catching you on a ladder.

Yes, and tie it to milestones rather than calendar dates. Say the draws land at rough-in complete and inspected, at drywall hung, at cabinets set. Say you collect lien waivers from your subs before each draw so the homeowner is never exposed to somebody else's unpaid bill. People are afraid of handing money to a builder who vanishes, and a published payment schedule removes that fear before it becomes an objection.

Allowances are where remodels turn sour, so handle them in writing first. If the contract carries tile at seven dollars a square foot and your client falls for a sixteen-dollar slab, that is a four-thousand-dollar conversation nobody planned for. Explain that allowances are placeholders, that you will walk selections with them early, and that the overage is theirs. Let the page do the arguing so the showroom does not have to.

Reply once, calmly, in public, then move the rest offline. Thank them, say you take it seriously, name the one thing you changed because of it, and offer a phone call. Do not relitigate the timeline, their selections or the money where everyone can read it, because people skim the facts and remember the tone. Then keep asking happy clients, since recent reviews carry the most weight.

Show both and explain what each means for the client, not for you. Fixed price buys certainty and carries your contingency inside the number. Cost-plus with a stated fee shows real invoices and often lands lower on a job with unknowns behind the plaster. A homeowner who reads that tradeoff on your site arrives ready to choose a structure instead of assuming the one you named favors you.

One site with three clear paths from the home page. A property manager turning a three-thousand-square-foot suite and a couple adding a primary bath need different proof, different vocabulary and different timelines. Give each one its own page and its own projects, then let the home page route people correctly. Three separate sites split your name and your reviews three ways for no gain.

Be findable and genuinely useful during those months instead of only at the end. A page on what an addition really involves, what drives the schedule, and how selections work gets saved, forwarded to a spouse and read twice. By the time she calls, she already understands your process and has decided you are the organized one. That call is a far shorter sale than a cold bid.

Yes, and it will win you work. Dust control and plastic walls, which bathroom stays usable, where the refrigerator goes, your crew's work hours, the day the water is off. Homeowners worry about this more than they worry about trim profiles. Writing it out proves you have run a kitchen with a family and a dog still in the house. Vague builders never bring it up.

Project pages and galleries are part of a normal build — send photos and the scope and we lay them out. A client portal, job scheduling or a live estimate tool is a custom feature and gets quoted separately, same as online stores and booking systems. The $25 plan covers a clear, fast business site with the domain, hosting and support in the price.

Get your Construction website online

The addition somebody is planning tonight will get built by whichever company looks most organized when she finally searches in March. Thirty days free is enough time to have a real site live on a yoursite.buildernow.net address before selections season starts.

Send us your job photos, your scope list and the way you run a draw schedule. We build the site. If it is not right you walk away having paid nothing, and if it is, it is $25 a month with the domain, hosting and support already in the price.

Start the 30-day free trial